Week 19: Cabs, Doors, Tile Prep, Millwork & Exterior Painting

Posted in 1915 Bungalow Remodel by abodepdx on May 6, 2010

It was a very busy week! Many tradesmen were working hard: cabinet installer, finish carpenters, tile setter and painters.

Alex of Crestwood Inc. installed most of the wood cabinets. He’ll get to the last wood cabinet in the kitchen next week.

bath: linen cabs

super secret pull-out cabs at stairs

Dana and Darren of Guillory Construction started the finish carpentry. They installed and cased all the interior doors, installed jamb extensions at the windows, installed and trimmed the medicine cabinet, trimmed the stair cabs, and started finish work on the stairs. And, they hid the water shut off behind a nice cabinet door. Dana used marine-grade plywood to conceal the rough finish of the existing concrete foundation wall at the stairs. Ingenious!

bath: med cab & window

family room: doors hung

stairs: marine-grade plywood

stairs

Yuri the tile setter of Art Touch Construction executed the prep work this week. He mudset the shower pan, installed wonderboard at the shower and floated the bath floor. Yuri even laid the wall tile.

shower: walls tiled

shower: pan & wonderboard

The painters from Aspen Painting LLC continued their work on the exterior. Vitaly, Pablo and Pancho prepped the porch, spackled the house in a few areas where the siding was a bit worn, painted the eaves, porch ceiling, upper shingles and lower siding. They are now hand rolling and brushing the trim and window casings. We can’t wait to see the finished product!

north elevation: paint prep

south elevation: exterior paint

west elevation: paint prep

garage: paint prep

front porch: paint prep 2

front porch: paint prep

Another triumph was the relocation of our phone service connection. The original service came in off an alley, crossed over three neighbors’ properties and attached to a neighbor’s garage before entering our house at the back. I contacted Qwest and explained the situation. They came out, surveyed the conditions and decided that the service connection was indeed not ideal. Qwest then relocated the phone service connection off of the main street at the front of the house. It was a very smooth, quick and easy process. We were without phone and internet for only a few hours during the transition. A big ‘thank you’ to Linda Dodge at Qwest for all her assistance. Wow! We also appreciate Seth of Integrated Technologies for stopping by on short notice to connect and activate the phone lines within the house.

phone service moved

Qwest

We were very excited to get our washer and dryer back in action this week. They had been sequestered to the storage room during the construction for the past month. Our neighbors had graciously allowed us to wash our clothes at their place. With our washer and dryer moved back to the laundry room, I now can do laundry in our own house. Yay!

Tune in next time for the tile install and accent paint!

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.