New walls and insulation
We are continuing to make progress on the garage (soon to be studio). Since all of the wiring is in place we are starting on moving the plumbing. We are moving a sink that is currently right at the entrance to the studio. We are going to move it to the other side of the washer and dryer so that it is out of the way. Also we are adding insulation, which should really help out in the summer and winter months! Here is the old sink and some of the completed insulation work:
The opening for the garage is carriage style with sliding doors. To make it better insulated and more secure we will be adding a wall behind the carriage doors and will leave a framed opening as another exit or air source. Here is the old view of the opening and the wall that has been constructed: