Grinding the floors and AC unit installed

Posted in Craftsman Garage into Art Studio by weststudio on October 14, 2010

Since we are all done with the drywall and the painting it is time for the floors to get ground down and sealed.  There is already existing cement that has interesting layers of epoxy and laminate, so we are grinding them down to make a blank slate.  Here you can see them ground clean:

And here you can see the nice new finished clear coating. We like how imperfections show up through the clear coating showing the age of the space from the interior.  The beams have a similar effect and so will our beautiful Rejuvenation lights when they are installed.

Although we insulated the space, there is pretty warm weather here in the summer.  There aren’t too many days that hit 100 degrees, but there are some.  Thus we installed an AC and heating unit.  In the interest of space, cost and sound we chose a wall mounted unit.  Here are some pics of the new unit.

One Response

Subscribe to comments with RSS.

  1. Dave said, on October 30, 2010 at 7:01 pm

    Interested to know what brand/model of AC you installed. It also heats?


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.